Quality Control Inspector
Spectraforce
Fontana, California
9 hours ago
Job Description
Job Title: Quality Control Inspector
Location: Fontana, CA 92337
Duration: 12 months Assignment
Shift/Hours: 32 to 40hours/week, M to F
Work Model: Fully onsite position
Roles & Responsibilities:
At SPECTRAFORCE, we are committed to maintaining a workplace that ensures fair compensation and wage transparency in adherence with all applicable state and local laws. This position’s starting pay is: $ 27.85/hr.
Location: Fontana, CA 92337
Duration: 12 months Assignment
Shift/Hours: 32 to 40hours/week, M to F
Work Model: Fully onsite position
Roles & Responsibilities:
- Perform a visual inspection of incoming shipments of distribution transformer units from Howard Industries.
- These shipments are coming from their Laurel, Mississippi facility and will be arriving at client's warehouse in Fontana, California.
- The inventory is designated as vendor managed inventory (VMI) and is owned and managed by Howard Industries at the Client’s Fontana facility.
- We are receiving five types of distribution transformers: Overhead (Pole Top), Single Phase Padmount, 3-Phase Padmount (500kVA and smaller), 3-Phase Power Padmount (750kVA or larger), and Buried Underground Residential Distribution (BURD) / Subway (submersible).
- The expectation for the inspector is to perform a thorough visual inspection of these transformer units and meticulously record any cosmetic issues in a tracking log.
- To assist you with the inspection process, a detailed job aid will be provided for each design, outlining the specific criteria to evaluate.
- Minimum of 3 trucks per day (Deliveries from Laurel, Ms.)
- ~75-100 units per day
- Overheads (50 units / day)
- 3-phase: (7 units /day)
- 1-phase and BURDS: (30 units /day)
- Air Compartment Integrity
- Damaged Subcomponent
- Damaged Tank (Scratch/Scrape, Dent, Missing Paint)
- Door Latching Issue
- Incorrect Nameplate/Stickers
- Incorrectly Labeled Component (i.e., Coil/Loop Switch)
- Internal Fault Detector (OH Only)
- Missing Subcomponents
- Oil Leak (Component/Gasket)
- Oil Leak (Weld)
- Pressure Relief Valve (PRV) issues including damage.
- Is the warranty period on the Warranty sticker accurate from date distribution transformer unit was manufactured.
- The warranty period is 18 months on overhead, single-phase pads, BURDs and smaller 3-phase padmount transformers (500kVA and smaller).
- The larger 3-phase padmounted transformers (750kVA or larger) are a 3-year warranty period.
- B. Associate's Degree
- Comfortable working in a warehouse environment.
- Able to bend down to look at nameplates and stickers for information while performing visual inspections.
- Will need to physically open the covers and doors of 1-phase and 3-padmounts to perform inspections.
- Willing to drive Southwire Fontana Warehouse at 11695 Pacific Ave, Fontana CA, 92337 and potentially other locations within Los Angeles and Orange County.
- Previous experience in quality control, especially in the electrical field, and proficiency in using inspection tools and software.
Applicant Notices & Disclaimers
- For information on benefits, equal opportunity employment, and location-specific applicant notices, click here
At SPECTRAFORCE, we are committed to maintaining a workplace that ensures fair compensation and wage transparency in adherence with all applicable state and local laws. This position’s starting pay is: $ 27.85/hr.